| You are here :: Home   : Projects Completed
|
|
Go back
to Transport Planning & Economics Page
|
| |
|
RITES' PROJECTS |
|
|
Projects Completed Transport Planning & Economics |
| |
1. Preparation of Modal Rail Concession Agreement for operation of container trains on Indian Railways
----------------------------------------------------------------------------------------------------------------------------------------------
2. Traffic cum Project Evaluation for dedicated rail freight corridor between:
- Eastern Corridor: Sonnagar – Ludhiana, Dankuni – Son nagar
- Western Corridor: Dadri – JNPT
----------------------------------------------------------------------------------------------------------------------------------------------
3. Master Plan study for Paradeep and Vishakhapatnam Port
----------------------------------------------------------------------------------------------------------------------------------------------
4. Study on operation and infrastructure of South Eastern, South Western and South Central Railway
----------------------------------------------------------------------------------------------------------------------------------------------
5. Design of new rail systems including merry go round systems top serve power plants of NTPC at Singrauli, Korba, Ramagundam, Vindyachal, Rihand Talcher, Khalgaon and Dadri
----------------------------------------------------------------------------------------------------------------------------------------------
6. Feasibility study of rail movement for proposed TATA Steel project in Bangladesh
----------------------------------------------------------------------------------------------------------------------------------------------
7. Total transport logistics plan study for TATA Steel ‘s proposed Soda Ash plant at Lake Natron, Tanzania
----------------------------------------------------------------------------------------------------------------------------------------------
8. Feasibility studies for movement of raw material and finished products for the Steel plants of TISCO and POSCO
----------------------------------------------------------------------------------------------------------------------------------------------
9. Master Plan for development of ICDs and CFSs in India
----------------------------------------------------------------------------------------------------------------------------------------------
10. Setting up of rail linked CFS at Dronagiri node near JN Port
----------------------------------------------------------------------------------------------------------------------------------------------
11. Techno economic study encompassing traffic estimation and project evaluation for new rail system at United Arab Emirates
----------------------------------------------------------------------------------------------------------------------------------------------
12. Economic and financial appraisal of new rail links, additional rail lines, bridges and gauge conversion works, inland waterways, roadways
----------------------------------------------------------------------------------------------------------------------------------------------
13. Impact assessment and concurrent evaluation of various poverty alleviation programmes at district and state level for Ministry of Rural Development
Client: --
Location: --, India
|
| ..................................................................................................................................................
|
|
|
|
|
|